Kitchen decoration is a big project, the installation of the cabinet needs to be noted

Kitchen decoration is a big project. What should you pay attention to when installing cabinets?

Cabinet installation is a relatively large project, but also the focus of kitchen decoration, not at any time can be installed, to match with other renovation projects, then when is the cabinet installed better? Let's take a look at what to do.

Cabinet installation time is relatively late, and there are more pre-workers. Before the hydropower transformation, first determine the location and style of the cabinet. If you want to customize the cabinet, you should first measure the size, facilitate the design of the hydropower plan, and then start the hydropower transformation. At this time, the sink, range hood, etc. can also be purchased, and the cabinet can be supplied in the second measurement. When carpentry and paving bricks come into the scene, the kitchen wall tiles and floor tiles can be used for the second measurement and the cabinet design is determined.

After the cabinet is finished, you need to wait for the following renovation works to complete the installation:

1. The ceiling of the kitchen should be completed, and usually the other ceilings can be used to start the ceiling work.

2. The doorway of the kitchen should be installed. It refers to the kitchen door frame. When the door is generally decorated, the door will be used as a door cover. The visual door effect is better.

3. The kitchen paint should be brushed. If the kitchen wall is painted, wait until the painting process is completed and there is no dust.

4. The kitchen stove and electrical appliances are ready. The last condition before the cabinet is installed, some things have been determined before the cabinet is made. Ready in advance, there will be no major problems during installation.

5. It should be noted that if it is an open kitchen, the difference is that in order to reduce the dust on the cabinet installation, etc., it is better to install the cabinet before the floor is laid.

After reading the above introduction, let you know more about when the cabinet is installed. In this process, you should also pay attention to the water and electricity renovation of the kitchen. The cabinets after installation should be checked and cleaned, so that you can decorate the kitchen with practicality and beauty.

Bathroom Cabinet

Bathroom Cabinet,Bathroom Wall Cabinet,Bathroom Mirror Cabinet,Custom Bathroom Vanities

DUOBUY TECHNOLOGY SHANDONG CO., LTD. , https://www.doubuytech.com